Nyhamna Expansion
Einar Bjelland
Kværner Site Manager
Nyhamna EPCm project
HMS
Kvalitet
Tid
2
© Kvaerner 2013
Leading & Lagging indicators Total Project
3
© Kvaerner 2013
Pågående aktiviteter
© Kvaerner 2013
Bemanning – Nyhamna Site (uke # 40)
Personer på
jobb
Totalt I
rotasjon
521
891
189
370
255
364
77
157
Totalt innkludert underleverandører
Totalt AF Group (Civil)
Totalt Kværner Stord
Totalt Beerenberg (ISO)
5
5
© Kvaerner 2013
Key Activity Schedule
Start DDE, 01Jan13
15.11
M2A
M2B
Critical
PO Issued
Global
design
Detail Design
Utility P&ID
Process P&ID
16.04
16.11
Design
freeze
Engineering
&
Procurement
M3A
M2C
Design
Complete
Follow on
Fabrication Engineering
01.05
Fabrication
Fabr start
Fabrication
Preassemblies of Modules
01.01
Ready for Polarled
Pipeline pulling
01.09
Civil Construction
Start
01.09
Ready for Polarled 01.08
Pipeline gas fill
MC Complete
01.07 Export
01.06
Compr
Installation
Modules Inst. Start
Booster
Compr
Installation at Nyhamna Site
01.09
01.10
RFSU Booster Compr (Kværner scope)
RFSU Export Compr (kværner scope)
Pre-Comm / Comm
© Kvaerner 2013
Incentive Milestones
2015 2016
2014 2015
Operatører
Ledelse & ingeniører
© Kvaerner 2013
Fabrication of modules
8
Kværner Verdal
3 Compressor Buildings
3128 ton
Kværner Stord
11 Modules & Piperacks
5377 ton
Nyhamna
Verdal
Prefabrication for KST
Stord
Newcastle
Gdansk / Gdynja
18 Various Modules
3378 ton
Cooec
© Kvaerner 2013
Cooec
14 Piperacks
1960 Ton
P35, P37 & P45
9
© Kvaerner 2013
I54, P45 & Landfall
10
© Kvaerner 2013
Competence Center, Office rig, Camp, Canteen
11
© Kvaerner 2013
Competence Centre
12
© Kvaerner 2013
© Kvaerner 2013
Copyright and disclaimer
Copyright
Copyright of all published material including photographs, drawings and images in this document remains vested in Kvaerner and third party contributors as appropriate.
Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable
acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction.
Disclaimer
This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to
differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the
regions and industries that are major markets for Kværner ASA and Kværner ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and
projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual
results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets
for Kvaerner’s businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange
rates and such other factors as may be discussed from time to time in the Presentation. Although Kværner ASA believes that its expectations and the Presentation are based
upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Kværner ASA is
making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Kværner ASA nor any of its directors,
officers or employees will have any liability to you or any other persons resulting from your use.
14
© Kvaerner 2013

Similar documents

×

Report this document